How is an FF&E install sequenced?
Freight arrives on a schedule, is checked against the order, and is staged close to the rooms it belongs to. Crews then open, assemble and place one floor or wing at a time, so finished rooms can be inspected while the next floor is under way. Packaging leaves the building as each floor is completed.
The property's own rules shape all of it: which elevator the crew may use, when guests are present, and where freight can be staged. Share those with the delivery schedule.